Skip to main content

iRubric: Sewing Project Evaluation Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Sewing Project Evaluation Rubric 
Used to evaluate sewing projects
Rubric Code: Y66326
Ready to use
Public Rubric
Subject: (General)  
Type: Project  
Grade Levels: 6-8, 9-12, Undergraduate

Powered by iRubric Sewing Project Rubric
  Poor

6 pts

Good

8 pts

Excellent

10 pts

Seams

Poor

Seams are puckered. They are wider than what the instructions call for.
Good

Seams are wider than what are called for in the instructions. In some places correct sides of the fabric are together.
Excellent

Seams are correct in width and construction. Correct sides of fabric are together.
Stitches

Poor

Stitch length is not correct or consistents, and tension is too tight or too loose
Good

Stitch length is correct, but tension is too loose or too tight at times
Excellent

Stitch length is correct and tension is perfect
Cutting

Poor

Cutting lines are not straight and trimmed seams are uneven
Good

Cutting lines are straight and most of trimmed seams are even
Excellent

All cutting lines are straight and trimmed seams are all even
Pressing

Poor

Project shows little to no evidence of pressing during sewing. Curved seams were not pressed correctly
Good

Project shows pressing was done during most of the steps during construction. Good attempt at pressing curved seams.
Excellent

Project shows pressing was done during all steps of construction. Curved seams are well pressed
Neatness/Clean

Poor

Project looks dirty or stained and shows evidence of finger prints
Good

Project is clean, but shows evidence of finger prints
Excellent

Project is clean and shows no evidence of finger prints
Threads

Poor

Threads were not trimmed during the sewing process
Good

Some threads were trimmed during the sewing process
Excellent

All threads were trimmed during the sewing process
Backstitching

Poor

Seams were not backstitched during the construction process
Good

Most seams were backstitched during the construction process
Excellent

All seams were backstitched during the construction process
Time Management

Poor

Project was turned in late - after the due date
Good

Project was turned in on time.
Excellent

Project was turned in on time or early
Clean Up

Poor

The student did not help clean up their area.
Good

The student only cleaned up their area when reminded.
Excellent

The student cleaned up room on daily basis and helped others.



Keywords:
  • Apron


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n178