Skip to main content

iRubric: Balsa Wood Bridge Construction Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Balsa Wood Bridge Construction Project 
Students design and build a balsa wood bridge that will hold the most weight and also be the lightest in the class.
Rubric Code: HX9X7XX
Ready to use
Public Rubric
Subject: (General)  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Boat project
Students are expected to make a boat of styrofoam. accessible and home, materials. The boat must float and carry a four film cannisters filled with dirt.
  Excellent

4 pts

Good

3 pts

Average

2 pts

Fair

1 pts

Sketch
20 pts

Students need to draw one sketch

Excellent

Sketch was complete and neat.
Good

Sketch was missing parts.
Average

Sketch was missing parts and was sloppy.
Fair

No sketch completed.
Truss bridge
20 pts

Make a symmetrical truss bridge

Excellent

Bridge is symmetrical.
Good

Bridge is somewhat symmetrical.
Average

Bridge is not very symmetrical.
Fair

Bridge is poor and not symmetrical at all.
Design of bridge
20 pts

Final build of bridge

Excellent

Design matched original sketch, angles were cut neatly and glue was not overly used.
Good

Design was close to original sketch, most angles were cut neatly, and glue was used properly.
Average

Design did not match the original sketch, bridge was sloppily built, and glue was everywhere.
Fair

Design was never completed.
Strength to weight ratio
20 pts

Divide weight held by weight of bridge.

Excellent

Strength to weight ratio was between .80 and 1.0. Grade will range from 93-100.
Good

Strength to weight ratio was between .79 and .51. Grade will range from 86-92.
Average

Strength to weight ratio was between .50 and .25.
Grade will range from 76-85.
Fair

Strength to weight ratio is lower than .24. Grade will range from 70-75.
Final appearance
20 pts

How bridge looks overall.

Excellent

Bridge appearance is awesome.
Good

Bridge looked pretty good.
Average

Bridge was basic and functional.
Fair

Bridge was poorly built.



Keywords:
  • Bouyancy, Renewable Energy, Environmental Impacts of Technology, Energy, Mass, Displacement


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n79