Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Manufacturing Project - Tee Hop rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Manufacturing Project - Tee Hop
Manufacturing Project - Supended Frame & Stand
Manufacturing projects integrating the use of tools, materials and processes dealing with woods, metals, plastics, and ceramics.
Rubric Code:
ZXX344
By
coreysmith
Ready to use
Public Rubric
Subject:
Vocational
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Tee Hop
Advanced
5 pts
Proficient
4 pts
Basic
3 pts
Fair
2 pts
Poor
1 pts
Incomplete
0 pts
Cutting
Advanced
The layout was cut out according to the instructions using the template and is the correct size and shape.
Proficient
The layout was cut out according to the instructions using the template and is the approximate size and shape.
Basic
The layout was cut out according to the instructions using the template but is not the approximate size and shape
Fair
The layout was cut out according to the instructions, but has some major imperfections and rough edges.
Poor
The layout was not cut according to the instructions.
Incomplete
The project was not cut out.
Formica
Advanced
The formica was attached correctly
Proficient
Not Applicable
Basic
Not Applicable
Fair
Not Applicable
Poor
Not Applicable
Incomplete
The formica was not attached correctly.
Sanding, Filing
Advanced
All parts of the project were properly sanded and have a fine, smooth texture.
Proficient
All parts of the project were properly sanded.
Basic
Most of the project was sanded properly.
Fair
The project was sanded, but has a rough texture.
Poor
Evidence of the project being sanded somewhat has been detected, but project is not finished.
Incomplete
There is no evidence of the project being sanded.
Drilling
Advanced
The holes were drilled according to size and position.
Proficient
The holes were drilled according to size and any given hole has at least less than 1/4 inch error in position.
Basic
The holes were drilled according to size with some of the holes more than 1/4 inch error in position.
Fair
None of the holes were drilled according to position with the correct size drill bit.
Poor
The holes were not drilled according to size and position.
Incomplete
The drilling was incomplete.
Injection Molding
Advanced
The molds were made according to the instructions and are the correct size and shape.
Proficient
The molds were mostly made according to the instructions. 3/4 of the Tees are the correct size and shape
Basic
The molds were mostly made according to the instructions. 1/2 of the Tees are the correct size and shape
Fair
The molds were mostly made according to the instructions. 1/4 of the Tees are the correct size and shape
Poor
The molds were completed, but less than 1/4 are the correct size and shape.
Incomplete
The Tees are incomplete.
Finish
Advanced
The project has been finished completely and according to the instructions. The finish is smooth and evenly applied.
Proficient
The project has been finished completely and according to the instructions.
Basic
The project has been finished according to the instructions with one minor imperfection.
Fair
The project has been finished with several minor imperfections.
Poor
The finish has one or more major imperfections.
Incomplete
A finish was not applied to the project.
Accuracy
Advanced
The project, overall, was accurately done with all the holes drilled in the correct place and cuts made even and according to the layout.
Proficient
The project, overall, was proficiently done with all the holes drilled in the correct place and cuts made even and according to the layout.
Basic
The project, overall, was done at a basic level with all the holes drilled in the approximate place and cuts made fairly even and according to the layout.
Fair
The project, overall, was done with some imperfections in hole placement and cuts made with some error.
Poor
The project, overall, was poorly done with all the holes drilled in the incorrect place and cuts made unevenly and not according to the layout.
Incomplete
Not Applicable
Directions
Advanced
The directions were followed completely. Any problems were solve with little or no help from the instructor.
Proficient
The directions were followed completely. Any problems were solved with help from the instructor.
Basic
The directions were not followed exactly and resulted in some small distortions in the final project.
Fair
The directions were not followed exactly and resulted in one or more major problems with the final project.
Poor
The directions were not followed and the final project was poorly done as a result.
Incomplete
The directions were not completed.
Keywords:
Tee Hop
Subjects:
Vocational
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Vocational rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n60
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.