Skip to main content

iRubric: Engineering Design Process rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Engineering Design Process 
This rubric is used to assess the students' use of the engineering design process.
Rubric Code: Z986X5
Ready to use
Public Rubric
Subject: Engineering  
Type: Project  
Grade Levels: K-5

Powered by iRubric Engineering Design Process
  Poor

1 pts

Fair

2 pts

Good

3 pts

Excellent

4 pts

Imagine

50- pts.

Poor

Little or No evidence of imagine was seen as they worked in a group.
Fair

Some evidence of imagine was observed.
Good

Good evidence of the group thinking and brainstorming about what they were going to build.
Excellent

They really got together as a group and imagined/brainstormed what they were going to build.
Plan

50 pts.

Poor

Little or no evidence was planned out. They did not plan what they were going to build nor plan on what materials to use in the building.
Fair

Some evidence of a plan. There was some thought to materials/building, but not really thought out.
Good

Good evidence of planning done. Materials were listed and thought out, but the plan wasn't quite complete.
Excellent

I can really see what you are going to be building. All materials were listed and well thought out.
Design

50 pts.

Poor

Your design lacked materials that were needed. It was really hard for me to tell what you built or were building.
Fair

Some materials were used correctly.
Good

Good use of the materials and plan. The project was well put together, but there were parts that weren't well made.
Excellent

Great use of materials! You maximized your use of materials.
Time Management

50 pts.

Poor

Did not use time well. Time was wasted during the imagine, plan, and design phase of engineering.
Fair

Sometimes used time well. There were times when the group got off task during the imagine, plan, and design phase.
Good

Good use of time, a few times the group got off task, but for the majority of the task time was well spent.
Excellent

Great use of time. The group stayed on task during each phase of the process.
Participation

50 pts.

Poor

All or Some group members had to be reminded several times to stay on task.
Fair

Most members participated in the building process. Had to be redirected a few times.
Good

The majority of the members worked together were not redirected that much.
Excellent

All group members worked together. The group never had to be redirected.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n202