Skip to main content
iRubric: Problem Definition rubric

iRubric: Problem Definition rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Problem Definition 
This rubric assesses the document which describes the intent of the project in sufficient detail to allow proper definition of milestones and allocation of resources on a weekly basis.
Rubric Code: Z6X99W
Ready to use
Public Rubric
Subject: Engineering  
Type: Assessment  
Grade Levels: Undergraduate

Powered by iRubric Problem Definition
  Exemplary

4 pts

Accomplished

3 pts

Developing

2 pts

Unacceptable

0 pts

Outcome

Exemplary

The overall project deliverable is captured in 2-4 sentences. It is clear how this project is different from other related work.
Accomplished

The project deliverable is described but some details of implementation are also included or the description is too long.
Developing

The description is too general to distinguish this project from related work.
Unacceptable

Just a title or a few words which do not differentiate this project from related work. or Describes the intent rather than deliverable. "provide clean water rather than modify pump to ...".
Requirements

Exemplary

Subsystem (software, electrical, mechanical) requirements are clearly specified. Requirements include measurable quantities.
Accomplished

Subsystem requirements are described but many measurable criterion are missing. "The axle will not break when used on bumpy roads"
Developing

The Outcome statement is broken down into smaller parts but is missing measurable criterion. Considerations such as environmental, appearance overall size are missing
Unacceptable

Just a bullet list of the user requests with no attempt to organize by subsection or specify measurable criterion.
Definition of success

Exemplary

Each measurable characteristic from the Requirements section has a pass/fail test defined.
Accomplished

Verification of each measurable characteristic from the Requirements section is included but the Pass/Fail criterion is vague for many items.
Developing

Simply calls for the verification of the requirement. "Verify that the system works after being dropped from 3 feet". Does not specify number of drops or how you know its "working"
Unacceptable

Verification section simply says that the overall project deliverable described in the Outcome section will be tested to see if it works.
Gantt Milestones

Exemplary

Gantt includes milestones for major subsections including Design Complete, Subsystem Verified as well as System Integration Complete, System Test Complete
Accomplished

Gantt milestones exist for the subsystems as well as the overall system but it is not clear that some of the project subsystems are independent and some rely on others and require integration
Developing

Gantt chart milestones assume all of the project will move through development at the same pace. Design Complete, Build Complete, Test Complete.
Unacceptable

Tasks for subsystems defined but no milestones identified




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n178