Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Class Work Completion and Attitude rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Class Work Completion and Attitude
Class Work Completion and Attitude
Completion of set tasks. Student must complete with 80% in order to pass.
Rubric Code:
V99BX4
By
shayes1113
Ready to use
Public Rubric
Subject:
Engineering
Type:
Class note
Grade Levels:
K-5, 6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Construction- Grading Skills
Excellent
5 pts
Good
4 pts
Fair
3 pts
Undeveloped
2 pts
Non-Compliance
1 pts
Class Work Completion
Excellent
The project was 100% complete and worked according to the task description.
Good
The project was complete and worked, but needed minor modifications. Only required 2-3 reclarifications.
Fair
The project was complete but did not work; needed several minor modifications. Required more then 3 reclarifications of task.
Undeveloped
The project was complete but did not work; needed several major modifications.
Non-Compliance
Student did not complete project in time period given, refused to start project or abandoned project once started.
Ability to Follow Directions/Needed
Excellent
Followed directions to the letter. Used others for guides. Student was able to complete the task without assistance.
Good
Followed directions. Listened to others around him when needed. Student was able to complete the task with little assistance.
Fair
Moderately followed directions. Worked at a pace that was productive but didn't listen to the teacher coaching him. Student was able to complete the task with assistance.
Undeveloped
Did not follow directions for any of the task and at times refused to slow down to do task well. Student was unable to complete task without major assistance.
Non-Compliance
Student was non-compliant when given directions 100% of the time. Student refused or was unable to start the project when offered assistance.
Student Preparedness/Time Managemen
Excellent
Student gathered all materials and was completely ready to go to work.Routinely used time well throughout the project.
Good
Student had/gathered most materials and went to work.Used time fairly well throughout the project.
Fair
Student had/gathered most materials, however, they needed excess time to do so.Procrastinated somewhat but did get the job done on time.
Undeveloped
Student did not have/gather some of the needed materials to perform work.Was unable to adequately meet timeline due to inablility.
Non-Compliance
Student struggled to gather materials required to complete the project. Student showed no interest in completing project.
Subjects:
Arts and Design
Engineering
Vocational
Types:
Project
Assignment
Class note
(Other)
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Arts and Design rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n202
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.