Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Building project #1 - Greenhouse rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Building project #1 - Greenhouse
Building project #1 - Greenhouse
Students had to build a scaled model of the Greenhouse that we built on our campus. Must have all elements,
Rubric Code:
V7A7X5
By
schroer
Ready to use
Public Rubric
Subject:
Math
Type:
Project
Grade Levels:
9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Building project#1
Poor
0 pts
Fair
2 pts
Good
3 pts
Very Good
4 pts
Excellent
5 pts
Detailed drawing
Poor
No drawing submitted
Fair
Drawing is vague with no measurements.
Good
Drawing is easy to follow with some measurements but still too vague.
Very Good
Drawing is easy to follow with lots of detail. Measurements are given but everything is two dimensional.
Excellent
Drawing is complete. Three dimensional with all measurements. Any person in class could easily build with drawing.
List of materials
Poor
No list of any kind is given out.
Fair
List of variables and materials is submitted, but incomplete. Important variable or type of material is missing.
Good
List of variables and materials is submitted and is almost complete. Minor variable or type of material is missing.
Very Good
List of variables and materials is submitted and complete. All major variables are present.
Excellent
List of variables and materials is submitted and complete. All major variables are present. Team has gone above and beyond as several additional variables are being measured
Greenhouse
Poor
No greenhouse
Fair
Greenhouse is built but is ineffective. Construction lacks stability. Variables can't be measured. Greenhouse doesn't fit within designated footprint.
Good
Greenhouse is built but only partially effective. Greenhouse fits within designated footprint.Construction lacks stability. Some variables can be measured, but several can't be measured easily.
Very Good
Greenhouse is well built and measurements are easy to obtain. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather.
Excellent
Greenhouse is well built and all measurements are easily obtained. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather. Team has incorporated extra features that make their greenhouse a step above the rest.
Completion Schedule
Poor
Greenhouse was not completed
Fair
Greenhouse was partially completed in the time allotted but no finished product
Good
Greenhouse was not completed in the time allotted and needed extra time to complete
Very Good
Greenhouse was completed but needed extra time after class time to complete the project.
Excellent
Greenhouse was completed on time and no extra time was requried.
Keywords:
Greenhouse, greenhouse gases, global warming
Subjects:
Math
Science
Types:
Project
Presentation
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Math rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n202
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.