Skip to main content
iRubric: Building project #1 - Greenhouse rubric

iRubric: Building project #1 - Greenhouse rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Building project #1 - Greenhouse 
Students had to build a scaled model of the Greenhouse that we built on our campus. Must have all elements,
Rubric Code: V7A7X5
Ready to use
Public Rubric
Subject: Math  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Building project#1
  Poor

0 pts

Fair

2 pts

Good

3 pts

Very Good

4 pts

Excellent

5 pts

Detailed drawing

Poor

No drawing submitted
Fair

Drawing is vague with no measurements.
Good

Drawing is easy to follow with some measurements but still too vague.
Very Good

Drawing is easy to follow with lots of detail. Measurements are given but everything is two dimensional.
Excellent

Drawing is complete. Three dimensional with all measurements. Any person in class could easily build with drawing.
List of materials

Poor

No list of any kind is given out.
Fair

List of variables and materials is submitted, but incomplete. Important variable or type of material is missing.
Good

List of variables and materials is submitted and is almost complete. Minor variable or type of material is missing.
Very Good

List of variables and materials is submitted and complete. All major variables are present.
Excellent

List of variables and materials is submitted and complete. All major variables are present. Team has gone above and beyond as several additional variables are being measured
Greenhouse

Poor

No greenhouse
Fair

Greenhouse is built but is ineffective. Construction lacks stability. Variables can't be measured. Greenhouse doesn't fit within designated footprint.
Good

Greenhouse is built but only partially effective. Greenhouse fits within designated footprint.Construction lacks stability. Some variables can be measured, but several can't be measured easily.
Very Good

Greenhouse is well built and measurements are easy to obtain. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather.
Excellent

Greenhouse is well built and all measurements are easily obtained. Greenhouse fits within designated footprint. Structure is sturdy and will withstand outside weather. Team has incorporated extra features that make their greenhouse a step above the rest.
Completion Schedule

Poor

Greenhouse was not completed
Fair

Greenhouse was partially completed in the time allotted but no finished product
Good

Greenhouse was not completed in the time allotted and needed extra time to complete
Very Good

Greenhouse was completed but needed extra time after class time to complete the project.
Excellent

Greenhouse was completed on time and no extra time was requried.



Keywords:
  • Greenhouse, greenhouse gases, global warming







Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n202