Students will measure, cut and solder a variety of fittings usine 1/2 inch copper pipe
Rubric Code: UX8X99B
Ready to use
Public Rubric
Subject: Vocational  
Type: Assessment  
Grade Levels: 9-12

Powered by iRubric Soldering Copper Pipe
Enter rubric description
  Beginner

1 pts

Developing

2 pts

Accomplished

3 pts

Exceptional

4 pts

Job Completion

Enter description

Beginner

The job was incomplete and did not work
Developing

The job was complete but needed several major modifications
Accomplished

the job was complete but needed minor modifications
Exceptional

The job was 100% womplete and worked according to the task description.
Ability to follow directions

Enter description

Beginner

Student did not or appear concerned to follow directions such as cutting pipe to correct length, wasting fittings, and/or using excessive solder
Developing

Student moderately followed directions
Accomplished

Student followed directions
Exceptional

Student followed directions to the letter
Level of assistance needed

Enter description

Beginner

Student was unable to complete the task without assistance.
Developing

Student was able to complete the task with moderate assistance
Accomplished

Student was able to complete the task with little assistance
Exceptional

Student was able to complete the task without assistance
Time Management

Beginner

Student was unable to meet timeline due to inability
Developing

Student procrastinated and did not use time efficiently
Accomplished

Student used time fairly well throughout the task
Exceptional

Student routinely used time well throughout the task to get the job done in a timely manner
Student Attitude During Project

Beginner

Student turned in a project simply to receive credit
Developing

Student turned in a project that is semi-decent to receive a fair grade
Accomplished

Student turned in a project they are pleased with
Exceptional

Student turned in a project they considered a reflection of their diligent efforts
Application of Safety Practices

Beginner

Student failed to follow safety rules
Developing

Student attempted to follow safety rules but failed to meet several
Accomplished

Student followed safety rules but may have forgotten one on one occasion
Exceptional

Student followed all safety rules 100% of the time
Assembly

Beginner

Soldered pipe had pinholes and excess build up of solder
Developing

Soldered pipe had pinholes or excess build up of solder
Accomplished

Soldered pipe had no pinholes but solder was not wiped clean
Exceptional

Soldered pipe had no pin holes, no excess buildup of solder, and soldered had been wiped clean on 100% of joints



Keywords:
  • Soldering, Copper Pipe, Plumbing

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n79