Skip to main content

iRubric: bar graph rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
bar graph 
Rubric Code: Q53599
Ready to use
Public Rubric
Subject: Education  
Type: Project  
Grade Levels: K-5

Powered by iRubric bar graph
  Unacceptable

(N/A)

Poor

(N/A)

Fair

(N/A)

Good

(N/A)

Excellent

(N/A)

labels and title 15 points

Unacceptable

Graph is not labeled or titled.
Poor

There is a title for the graph but no labels.
Fair

One side of the graph is labeled. There is no title.
Good

Both sides of the graph are labeled correctly. There is NOT an appropriate title.
Excellent

Both sides of the graph are labeled correctly. There is an appropriate title.
measurement 15 points

Unacceptable

Bars are drawn crooked and viewer cannot follow the graph.

AND/OR

inaccurate representation of data collected.
Poor

Only some of the bars are drawn straight and accurately.

AND/OR

inaccurate representation of data collected.
Fair

Most of the bars are drawn straight and accurately.

BUT

inaccurate representation of data collected.
Good

Most of the bars are drawn straight and accurately.

AND

Mostly accurate representation of data collected.
Excellent

All bars are drawn straight and accurately. All data is accurately represented. The viewer can easily follow the graph.
Data collection 5 points

Unacceptable

Less than 10 people were surveyed
Poor

11-13 people were surveyed.
Fair

14-16 people were surveyed.
Good

17-19 people were surveyed.
Excellent

20 or more people were surveyed.
neatness 10 points

Unacceptable

The graph is sloppy and does not demonstrate good fourth grade work and effort.
Poor

The graph is not colored and is only somewhat neatly done.
Fair

The graph is somewhat neat and colorful.
Good

The graph is mostly neat and colorful
Excellent

The graph is completed in a neat and colorful manner that is easy to read.
Time 5 points

Unacceptable

Project is more than one week late.
Poor

Project is one week late.
Fair

Project is 2 or more days late.
Good

Project is one day late.
Excellent

Project is completed and turned in on the due date.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n178