Skip to main content

iRubric: Project Layout Rubric

find rubric

(draft) edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Project Layout Rubric 
This rubric will define what is expected from you when you are laying out your project.
Rubric Code: Q23XW54
Draft
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Project Layout Rubric
  Poor

12 pts

Fair

14 pts

Good

17 pts

Excellent

20 pts

Chalk Lines

Poor

More than 2 chalk lines are missing, not in the correct location, or not visible.
Fair

Not more than 2 chalk lines are missing, not in the correct location, or not visible.
Good

No more than 1 chalk line is missing, not in the correct location, or not visible.
Excellent

All chalk lines are snapped, visible and in the correct location
Squareness

Poor

Project is our of square by more than 1/4 of an inch.
Fair

Project is out of square by not more than 1/4 of an inch.
Good

Project is out of square by not more than 1/8 of an inch.
Excellent

Project is completely square.
Window Layout

Poor

More than 2 windows are not in the correct location or more than 2 measurements are incorrect.
Fair

Not more than 2 windows are not in the correct location or not more than 2 measurements are incorrect.
Good

Not more than 1 window is not in the correct location or not more than 1 measurement is incorrect.
Excellent

All windows are in the correct location and all measurements are correct.
Door Layout

Poor

More than 4 doors are in an incorrect location or more than 4 measurements are incorrect.
Fair

Not more than 4 doors are in an incorrect location or not more than 4 measurements are incorrect.
Good

Not more than 2 doors are in an incorrect location or not more than 2 measurements are incorrect.
Excellent

All Doors are in the correct location and all measurements are correct.
Completion Deadline

Poor

Project was completed more than 15 minutes late.
Fair

Project was completed not more than 15 minutes late.
Good

Project was completed not more than 10 minutes late.
Excellent

Project was completed on time.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to ready to use.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n202