Skip to main content
iRubric: ART Project Rubric

iRubric: ART Project Rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Art projects without a specific rubric or other assessment criteria will be evaluated and graded using the following rubric.
Rubric Code: P7WC5C
Ready to use
Public Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Project
Art Project
  Excellent

4

(N/A)

Above Average

3

(N/A)

Below average

2

(N/A)

Poor

1

(N/A)

Understanding
4 pts

Demonstration that instructions and concepts are understood.

Excellent

The artwork is planned carefully; understanding of most concepts and instructions is shown.
Above Average

The art work is planned adequately; understanding of some concepts and instructions shown.
Below average

The artwork shows little evidence of understanding the concepts and instructions.
Poor

The artwork shows no understanding of the concepts and instructions.
Craftsmanship/ Skill
4 pts

Neatness, precision, care.

Excellent

The artwork shows good craftsmanship, with some attention to detail.
Above Average

The artwork shows average craftmanship and attention to detail.
Below average

The artwork shows below average craftmanship and little attention to detail.
Poor

The artwork shows poor craftmanship and no attention to detail.
Creativity/ Originality
4 pts

Inventiveness, expression of ideas and imagination.

Excellent

The artwork demonstrates some personal expression.
Above Average

The artwork demonstrates an average amount of personal expression.
Below average

The artwork demonstrates little personal expression.
Poor

The artwork lacks evidence of personal expression.
Effort
4 pts

What it takes to finish the project as well as possible, time dedicated to the project inside and/or out of class.

Excellent

The student put forth the effort required to complete the project well; used class time well.
Above Average

The student put forth the effort required to finish the project; used class time adequately.
Below average

The student put forth the effort required to finish the project; used class time adequately.
Poor

The student put forth no effort or the project was not completed; class time was not used well.
Materials
4 pts

Followed directions and used materials properly.

Excellent

The student followed directions and used the materials exactly as instructed.
Above Average

The student followed directions and used the materials in an acceptable manner.
Below average

The student did not follow directions in an acceptable manner.
Poor

The student totally disregarded directions that entailed the proper use of materials.



Keywords:
  • Art work


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n232