Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Baseboard trim project rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Baseboard trim project
Biscuit Joiner Project
Install trim with2 coped joints and 2 outside corners
Rubric Code:
NX27A99
By
Steve_antrim
Ready to use
Public Rubric
Subject:
Vocational
Type:
Assignment
Grade Levels:
9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Biscuit joiner project
Poor
1 pts
Fair
2 pts
Good
3 pts
Advance
4 pts
Plan
Poor
The student didn't get the project ready for the project in anyway.
Fair
The students didn't prep materials, did't measuer any of the materials, and didn't know the tools before starting.
Good
The students will prep most material, but didn't measuer all material and didn't know all of the tools being used before starting the project.
Advance
The students prep a all materials, before starting the project. Student will know all measuerments and tools before starting project.
Safety
Poor
Student had to be reminded more than 3 times to stay safe.
Fair
Student fallowed safety rules, but had to be reminded 2 to 3 times.
Good
Student fallowed safety rules but had to be reminded 1 time to stay safe.
Advance
Student fallowed all safety rules in the shop and in the classroom.
Measurements
Poor
Student got all measurmetns with in 1/4 of an inch.
Fair
Students got all measuerments with in 3/16 of an inch.
Good
Student got all measurmetns with in 1/8 of and inch.
Advance
Students got all measurements with in 1/16 of an inch.
Joints
Poor
Student got all joints tight to within 3/16 inch.
Fair
Student got all joints tight to within 1/8 inch.
Good
Student got all joints tight to within 1/16 inch.
Advance
Student got all joints tight to within 1/32 inch.
Finish
Poor
project contains excesive hammer and tool marks
Fair
Good
project contains minimal hammer and tool marks
Advance
project contains no hammer and tool marks
Completion
Poor
Three or more days late.
Fair
Two days late.
Good
One day late.
Advance
Students finished project by due date.
Subjects:
Vocational
Types:
Assignment
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Vocational rubrics
More Assignment rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n232
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.