Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Art 2 Color Scheme Acrylic Painting rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Art 2 Color Scheme Acrylic Painting
Art 1 Graphite Still Life
Rubric Code:
M384B5
By
jmoffitt
Ready to use
Public Rubric
Subject:
Arts and Design
Type:
Project
Grade Levels:
9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Color Scheme Acrylic Painting
Excellent
4 pts
Good
3 pts
Fair
2 pts
Poor
1 pts
Porportions
Excellent
All objects are represented accurately and are in perspective. Interior detail is present and accurate.
Good
Most objects are represented accurately and are in perspective. Minor corrections needed.Interior detail is present however is lacking in accurateness
Fair
Some objects are represented accurately and are in perspective. Numerous corrections are needed. NO interior detail
Poor
No objects are represented accurately and are in perspective. NO interior detail
Value Change
Excellent
Value change is present in all objects and skillfully executed. No outlines are present.
Good
Value change is present in all objects. Improvements could be made on execution. No outlines are present.
Fair
Value change is present in some objects. Improvements could be made on execution. No outlines are present.
Poor
Value change via is not present. Outlines are visible.
Craftsmanship
Excellent
Composition is interesting with minimal negative space. All four edges are activated.No folds, tears, bends in paper, unwanted marks, smudges....Piece is ready to be shown
Good
Composition is average with minimal negative space. All four edges are activated.Some folds, tears, bends in paper, unwanted marks, smudges....Piece is not ready to be shown.
Fair
Composition is average with minimal negative space. All four edges are not activated.Folds, tears, bends in paper, unwanted marks, smudges....Piece is not ready to be shown.
Poor
Composition does not activate all edges and and is unfinished. Yikes...what happened?
Color Scheme
Excellent
All 5 rectangles have color schemes that are correctly deomnstrated. Value change is clearly demonstrated in each rectangle as well. The value change tranisition from the background to the rectangles matches
Good
All 5 rectangles have color schemes that are correctly deomnstrated. Value change is clearly demonstrated in each rectangle as well. The value change tranisition from the background to the rectangles does not match in all rectangles
Fair
Some rectangles have color schemes that are correctly deomnstrated. Value change is present in some rectangle as well. The value change tranisition from the background to the rectangles does not match in all rectangles
Poor
Rectangle color schemes are not correctly deomnstrated. No vlaue change present. The value change tranisition from the background to the rectangles does not match in all rectangles
Subjects:
Arts and Design
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Arts and Design rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n178
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.