Skip to main content

iRubric: Art Project Rubric

find rubric

(draft) edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Art Project Rubric 
Art projects without a specific rubric or other assessment criteria will be evaluated and graded using the following rubric.
Rubric Code: M2357A
Draft
Private Rubric
Subject: Arts and Design  
Type: Project  
Grade Levels: 9-12

Powered by iRubric Project
  Outstanding: A

20 pts

Above average: B

18 pts

Average: C

17 pts

Below average: D

15 pts

Poor: F

13 pts

Elements & Principles of Design
20 pts

Demonstration that instruction and concepts are understood.

Outstanding: A

Planned carefully. Made several sketches, and showed an understanding of the elements and principles of design. Good composition and use of media.
Above average: B

Artwork shows that the student applied the principles of design while using one or more elements effectively. The space is filled adequately.
Average: C

Student did the assignment satisfactorily, yet shows lack of planning and little evidence that an overall composition was planned.
Below average: D

Assignment was completed and turned in, but showed little evidence of any understanding of the elements and principles of art. There is no evidence of planning.
Poor: F

Student did the minimum or the artwork was never completed.
Creativity/ Originality
20 pts

Inventiveness, generation of ideas and use of imagination. Willingness to take risks.

Outstanding: A

Student generated many ideas, made unusual connections or changes on several ideas; built upon previous knowledge. Demonstrated willingness to take risks.
Above average: B

Student tried a few ideas before selecting one, or based their work on another person's idea. Made decisions after referring to one source. not willing to take a risk.
Average: C

Student tried one idea and carried it out adequately, but lacked originality. Substituted symbols for personal observation; might have copied work or ideas.
Below average: D

Student fulfilled the assignment, but gave no evidence of trying anything unusual.
Poor: F

Student showed no evidence of original thought.
Effort/Perserverance
20 pts

What it takes to finish the project as well as possible, time dedicated to the project inside and/or out of class.

Outstanding: A

The project was continued until it was as complete to the best of the student's ability. Demonstrates pride in going well beyond the requirement.
Above average: B

Student worked hard and completed the project, but with a little more effort it might have been outstanding.
Average: C

Student finished the project, but it could have been improved with more effort. An adequate interpretation of the assignment, but lacking "finish." Chose an easy project and did it indifferently.
Below average: D

The project was completed with minimum effort.
Poor: F

The student did not finish the work adequately.
Craftsmanship/ Skill
20 pts

Neatness, precision, care. Correct use of materials and tools.

Outstanding: A

Artwork is neat and executed with with precision. The work reflects the care and patience that went into making it. Excellent use of materials and tools.
Above average: B

With a little more effort, the work could have been outstanding; lacks the finishing craftsmanship and neatness. Good use of materials and tools.
Average: C

Student showed average craftsmanship; adequate, but not as good as it could have been; a bit careless.Adequate use of materials and tools.
Below average: D

Student showed below-average craftsmanship; lack of pride in finished artwork.Misuse of materials and tools.
Poor: F

Student showed poor craftsmanship; evidence of laziness or total lack of understanding.Knowing waste of materials and destruction of tools.
Cooperation/Attitude
20 pts

Attitude during class time; willingness to complete set up, art practice and clean up tasks.

Outstanding: A

The student is always willing to complete assigned tasks and help set up and clean up projects; works very well with others.
Above average: B

The student is usually willing to complete assigned tasks and help set up and clean up projects; works well with others.
Average: C

The student is sometimes willing to complete assigned tasks and help set up and clean up projects; works somewhat well with others.
Below average: D

The student is rarely willing to complete assigned tasks and help set up and clean up projects; sometimes works well with others.
Poor: F

The student does not show willingness to complete assigned tasks and help set up and clean up projects; does not work well with others.



Keywords:
  • Art work


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to ready to use.
Share

Add to Gallery

Let others view this rubric in Rubric Gallery.

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n178