Skip to main content
iRubric: Math Course 1 rubric

iRubric: Math Course 1 rubric

find rubric

(draft) edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Math Course 1 
Chapter 2 Survey Project
Rubric Code: L8758C
Draft
Public Rubric
Subject: Math  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Survey Project
  Outstanding

5 pts

Excellent

4 pts

Good

3 pts

Fair

2 pts

Unsatisfactory

1 pts

Collecting Data

The survey questions were turned in with the project. The data was recorded on two different graphs. The graphs were created accurately and accurately display the data.

Outstanding

The student went beyond the given expectations.
Excellent

The student met the given expectations.
Good

The student met most of the given expectations.
Fair

The student met some of the given expectations.
Unsatisfactory

The student did not meet any of the given expectations of the project. The project was not completed.
Analyzing Data

The mean, median, and mode were calculated accurately based on the given data. The student determined which method best described the data and has explained why they chose that method.

Outstanding

The student went beyond the given expectations.
Excellent

The student met the given expectations.
Good

The student met most of the given expectations.
Fair

The student met some of the given expectations.
Unsatisfactory

The student did not meet any of the given expectations of the project. The project was not completed.
Questions

The following questions were answered accurately based on the data and graphs.
1. Which graph did not express the information well. Explain why not.
2. Which graph do you think expressed the information the best and why?

Outstanding

The student went beyond the given expectations.
Excellent

The student met the given expectations.
Good

The student met most of the given expectations.
Fair

The student met some of the given expectations.
Unsatisfactory

The student did not meet any of the given expectations of the project. The project was not completed.
Display

The display is neat, organized, colorful, and easy to follow.

Outstanding

The student went beyond the given expectations.
Excellent

The student met the given expectations.
Good

The student met most of the given expectations.
Fair

The student met some of the given expectations.
Unsatisfactory

The student did not meet any of the given expectations of the project. The project was not completed.




Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to ready to use.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n60