Skip to main content

iRubric: Crochet Project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Rubric Code: L23C586
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: (none)

Powered by iRubric Crochet Project
  Poor 1-3

(N/A)

Fair 4-7

(N/A)

Good 8-10

(N/A)

Stitches/Techniques

Student used techniques beyond single crochet.
Other skills include Increasing, Decreasing, Ribbing, etc.

Poor 1-3

Fair--Student used a pattern that did not increase their abilities with crochet techniques. Student only used the chain stitch and single crochet for this project.
Fair 4-7

Good--Student used a pattern that somewhat stretched their abilities. Student used at least 1 other stitches/techniques besides the chain stitch and single crochet.
Good 8-10

Excellent--Student used a complicated pattern that stretched their abilities. Student used at least 2 other stitches/techniques besides the chain stitch and single crochet.
Stitches

The stitches were done correctly and consistently.

Poor 1-3

Student's work had many issues with completing the correct stitch technique and or consistency of stitches. The stitches look inconsistent and messy.
Fair 4-7

Over 1/2 of the stitches were completed consistently and done correctly.
Good 8-10

All stitches were completed consistently and done correctly. The finished project looks great.
Tension

The crocheter/knitter consistently regulated the tension of their stitches.

Poor 1-3

Several areas of stitching were completed too tightly or too loosely.
Fair 4-7

Some stitches were either done too loosely or too tightly
Good 8-10

All stitches were completed using a consistent amount of tension.
Width

Student was able to count stitches to keep an even width through the project.

Poor 1-3

There was no attempt to count stitches and maintain width, the project has severe tapering.
Fair 4-7

Some attempt was made to count stitches and maintain width, there is slight tapering.
Good 8-10

Stitches were counted and each row has the same width, creating an even width project.
Work Ethic

Student worked each day, all class period on the project. If the class was missed, the student made up the missed time at home or in study hall.

Poor 1-3

Worked some in class, worked more at home, not turned in on time and project was not finished
Fair 4-7

Worked off and on in class, worked some at home, not turned in on time but project is finished
Good 8-10

Worked everyday in class, worked some at home, turned in on time and project was finished



Keywords:
  • Crochet

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n202