Skip to main content

iRubric: Create an informational project rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Create an informational project 
Use the appropriate program and information provided to create a holiday card.
Rubric Code: EXX9596
Ready to use
Public Rubric
Subject: Social Sciences  
Type: Exam  
Grade Levels: K-5, 9-12

Powered by iRubric Informational project
  Did not meet Expecations

Student can be scored from 0-10.

1 pts

Approaching Expectations

Student can be scored from 11-15.

2 pts

Met Expectations

Student can be scored from 16-20.

3 pts

Exceeded Expectations

4 pts

Asthetics/Appearance

Did not meet Expecations

Inappropriate graphic, or no graphic, border, background was used.
Approaching Expectations

An appropriate graphic border.
Met Expectations

An appropriate graphic border, background was used.
Exceeded Expectations

An appropriate and creative graphic was used.
Colored illustrations were included. Work is neat and presentable.
Information Accuracy

Did not meet Expecations

Information is incorrect with several errors present.
Approaching Expectations

Information is correct with one error. There is little research.
Met Expectations

Information is correct and there are no errors. Research is accurate
Exceeded Expectations

Information is correct and there are no errors and research is extensive and accurate
Spacing/Layout

Did not meet Expecations

Project is spaced poorly and is not easy to understand or read.
Approaching Expectations

Project is spaced appropriately. Little effort or details.
Met Expectations

Project is spaced and designed appropriately so the reader can easily see the important information.
Exceeded Expectations

Project is spaced and designed appropriately so the reader can easily see the important information. Project is detailed and organized.
Effort/Time Spent

Did not meet Expecations

Time was not used well and project is incomplete or incorrectly completed.
Approaching Expectations

Most of the time allowed was used to finish the project correctly.
Met Expectations

Time was used to research appropriate material, arrange project, and the project was completed within the class period.
Exceeded Expectations

Time was used to research appropriate material, arrange project, and the project was completed within the class period with all components. A glossary, and/or references were included.





Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.

n202