Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Hand Sewing Button Rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Hand Sewing Button Rubric
Hand Sewing Button Rubric
Rubric Code:
ECWC3C
By
cbosch
Ready to use
Public Rubric
Subject:
Vocational
Type:
Assignment
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Criteria
Wow
4 pts
Almost There
3 pts
On the Way
2 pts
Not Yet
1 pts
Stitches
Wow
All stitches are neat and free of any loops. The needle consistently went in and out of the same holes
Almost There
Most stitches are neat and free of any loops. The needle mostly went in and out of the same holes.
On the Way
Some stitches are neat and free of any loops. The needle sometimes went in and out of the same holes.
Not Yet
Most stitches are untidy with many loops. The needle rarely went in and out of the same holes. Some stitches go over the edge of the button or over the edge of the fabric.
Shank
Wow
Thread was snugly wrapped about 5 times under the button to produce a shank. The fabric lies flat and doesn't pucker.
Almost There
Thread was wrapped about 5 times under the button to produce a shank but the fabric puckers.
On the Way
Thread was inconsistently wrapped under the button. The fabric puckers
Not Yet
Student forgot to wrap a shank.
Knots
Wow
The knots on the back of the fabric are consistently neat. The ends of the threads are cut close to the knot.
Almost There
The knots on the back of the fabric are for the most part neat or the ends of the threads weren't cut close to the knot
On the Way
The knots are inconsistent (too big or too small, perhaps with loops). The ends of thread weren't cut close to the knot.
Not Yet
Student forgot to knot the thread.
Time Management
Wow
Completed 100% of the steps in the allotted time.
Almost There
Completed 75% of the steps in the allotted time.
On the Way
Completed 50% of the steps in the allotted time.
Not Yet
Completed less than 25% of the steps in the allotted time.
Clean Up
Wow
Student cleaned up room on a daily basis. They made sure everything was put away properly.
Almost There
Student helped clean up thoroughly with few prompts.
On the Way
Student helped clean up but needed several prompts.
Not Yet
The student did not help clean up the room.
Keywords:
Hand sewing button
Subjects:
Vocational
Types:
Assignment
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Vocational rubrics
More Assignment rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n232
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.