0 pts
10 pts
15 pts
20 pts
25 pts
Project Time will be based on lobor hours as dictated by industry standards produced in collision estimating guides.
Project Complexity will be a such that it will require a combination of skills learned learned in the Long Term Certificate Program.
Proper usage of labor, and materials will be based on a the formulas found in the collision estimation guide's procedure pages.
Appearance of the project will be held to the standards used in the collision industry. These high quality standard are based on what is considered to be an acceptable repair.
The level of expertise will be based on skills aqquired in one year of training. It will be to the benefit of the student's final score to perform at the highest skill level possible and produce a high quality finished project.