Spaghetti Bridge Project
Spaghetti Bridge Project
Student will design and construct a bridge made of commercial pasta, skewers, and tape. The design must hold the most weight possible.
Rubric Code:
E249W4C
By
jennilabossi
Draft
Public Rubric
Subject:
Engineering
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Bridge Design
Excellent
4 pts
Good
3 pts
Fair
2 pts
Poor
1 pts
Drawing / Design
Excellent
Drawing is complete
Good
Drawing s partially complete
Fair
Drawing is not complete
Poor
Drawing not handed in
Limits
bridge is 12 inches(30 cm) in length
Excellent
All measurements are within the constraints set by work order
Good
Most measurements are within the constraints set by work order
Fair
Some measurements are within the constraints set by work order
Poor
Few measurements are within the constraints set by work order
Function
hold weight of the textbooks
Excellent
Structure functions extraordinarily well, holding up under atypical stress.
Good
Structure functions well, holding up under typical stress
Fair
Structure functions pretty well, but deteriorates under typical stress.
Poor
Fatal flaws in function with complete failure under typical stress.
Construction
Excellent
Great care taken in construction process, so structure is neat, attractive and strong.
Good
Construction was careful and accurate for most part, but 1 -2 details could have been refined for a more attractive and strong bridge.
Fair
Constructed adequately and but did not follow plans, and/or 3-4 details could have been refined.
Poor
Construction appears careless and haphazard
Time Mgmt/Cooperation
Excellent
Team managed time and worked very well together, displaying great cooperation and effort
Good
Team managed time and worked well together. Displayed sufficient cooperation. Effort was satisfactory
Fair
Team managed time poorly and/or did not work well together. Effort was lacking
Poor
Team did not manage time and worked poorly together. No effort was made.
Subjects:
Arts and Design
Engineering
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Arts and Design rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to
ready to use
.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n232
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.