Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Trebuchet Toss rubric
find rubric
Your browser does not support iframes.
(draft)
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Trebuchet Toss
Trebuchet Toss
Students design, build, and test a model trebuchet.
Rubric Code:
DXXA475
By
jayhop
Draft
Public Rubric
Subject:
Engineering
Type:
Project
Grade Levels:
9-12
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Trebuchet Toss
Unsatisfactory
0 pts
Fair
1 pts
Good
2 pts
Excellent
3 pts
Planning Stage
Unsatisfactory
Student did not complete any drawings.
Fair
Parts of the required drawing are missing and the material list is missing.
Good
Student completed the required drawings but the views were not correct. The materials needed to construct the trebuchet were listed.
Excellent
Student completed drawings of their own design or completed drawings of the demonstration model. Materials to build the trebuchet were listed.
Construction Phase
Unsatisfactory
Student did not attempt to build a working trebuchet.
Fair
Student did not finish the trebuchet. Construction was started but the model was not ready for testing or did not work properly. The quality of construction was fair.
Good
Student completed a working trebuchet that was identical to the instructors model. The quality of construction was good.
Excellent
Student completed a working trebuchet that was different from the demonstration model or the same as the demonstration model. The quality of construction was excellent.
Testing Phase
Unsatisfactory
Student did not test the trebuchet and did not complete the test results chart.
Fair
Student tested their trebuchet but did not complete the test result chart. Most of the information required in the testing phase is missing.
Good
Student tested their trebuchet but did not complete the testing results chart. Some of the required information is missing.
Excellent
Student completed 3 tests and measured projectile distance and distance landed from the target. Student completed the average of the 3 tests. Test results chart was complete.
Evaluation Phase
Unsatisfactory
Student did not answer any of the questions or less than 4 questions in the evaluation phase
Fair
Student answered 4-6 of the questions in the evaluation phase.
Good
Student answered 7-9 of the questions in the evaluaton phase.
Excellent
Student completly answered all 10 of the questions in the evaluation phase.
Subjects:
Engineering
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Engineering rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
This rubric is still in draft mode and cannot be scored. Please change the rubric status to
ready to use
.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n60
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.