Skip to main content
iRubric: Pin cushion 1st sewing project - hand sewn rubric

iRubric: Pin cushion 1st sewing project - hand sewn rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Pin cushion 1st sewing project - hand sewn 
Pin cushion made with stretchy fabric with pumpkin and looping stitches, button, and small mouth jar lid inside felt base
Rubric Code: CX8X5XX
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Pin cushion
  Poor (D)

7 pts

Fair (C)

8 pts

Good (B)

9 pts

Excellent (A)

10 pts

Neatness/stitching

Poor (D)

Fabric cutting or sewing was careless. Pin cushion is not a round or oval shape. Marker ink shows. Messy stitching. Large gaps between stitches. Wrong stitches used.
Fair (C)

Some attempt was made carefully and to stitch to work carefully. Pumpkin and looping stitches were attempted, but messy.
Good (B)

Good attempt was made to cut and to stitch straight and even. Pin cushion is a round or oval shape. Stitches are correctly done, but not even.
Excellent (A)

Cutting/stitching is straight and even. Pin cushion is a round or oval shape. Visible stitches (pumpkin and loop are evenly spaced and completed correctly.
Stuffing

Poor (D)

Little to no stuffing used.
Fair (C)

Messy. Pincushion is not completely filled and/or is lumpy is not firm.
Good (B)

Almost completely filled. Is flat and not puffy.
Excellent (A)

Pincushion is firmly filled and puffy. No stuffing is falling out.
Work Habits

Poor (D)

Did not pay attention and required individual repetition. Skipped steps, did not redo mistakes. Incomplete.
Fair (C)

Student worked, but was chatty and not always on task. Skipped some steps. Missing jar lid.
Good (B)

Student worked independently with few reminders to keep on task. All steps completed.
Excellent (A)

Student worked independently after instruction and was a help to others.
Neatness/Clean Up

Poor (D)

Work area is messy. Doesn't clean up.
Fair (C)

Work area is messy. Doesn't clean up.
Good (B)

Work area is almost kept clean.
Excellent (A)

Work area is kept clean including floor around table.
Time Management

Poor (D)

Not finished on time and not working entire class time. In a hurry.
Fair (C)

Not finished on time.
Good (B)

Almost finished on time.
Excellent (A)

Finishes right on time.



Keywords:
  • hand sewing


Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n202