Skip to main content
sign in
Username
Password
forgot?
Sign up
Share
help_outline
help
Pricing
Request Info
Please enable JavaScript on your web browser
menu
iRubric: Toothpick Bridges rubric
find rubric
Your browser does not support iframes.
edit
print
share
Copy to my rubrics
Bookmark
test run
assess...
delete
Do more...
Toothpick Bridges
Toothpick Bridge Building
Bridge must be designed and constructed out of toothpicks and glue. The bridge must be prepared according to directions. The bridge must be built to withstand weight.
Rubric Code:
C2X7546
By
laurelncook
Ready to use
Public Rubric
Subject:
Vocational
Type:
Project
Grade Levels:
6-8
Your browser does not support iframes.
Desktop Mode
Mobile Mode
Score
Level 1
4 pts
Level 2
3 pts
Level 3
2 pts
Level 4
1 pts
Team Work
Level 1
Each member had a clear understanding of his/her job and performed duties well.
Members were able to compromise when different opinions were held.
Level 2
Each member had a clear understanding. Had to be redirected when off task..occurred more than once but less than four times.
Level 3
Members had to be retaught job responsibilities. Teacher intervention needed to settle difference of opinions.
Level 4
Frequent absences by members caused disruption of work. Intervention was needed when there was a difference of opinion.
Members had to be continually redirected to task.
Blueprint
Level 1
Bridge blueprint matches the design of the finished product and meets all of the guidelines of the bridge.
Level 2
Bridge blueprint mostly matches the design of the finished product and somewhat meets the guidelines of the bridge.
Level 3
Bridge design somewhat matches the design of the blueprint and meets limited guidelines of the bridge.
Level 4
Bridge design does not match the design of the blueprint. Was not a bridge.
Specification
This score will either be awarded a Level 4 or Level 1 score.
Level 1
Bridge met the required specs:
Length 12"-24"
Width 2 1/2" - 2 3/4"
Width up to 8"
Level 2
Level 3
Level 4
Bridge was smaller or larger than the required specs.
Structure
Level 1
Perfectly square. Bridge was prepared according to instructions.
Level 2
80%-90% square.
Level 3
70%-80% square.
Level 4
Not to specs.
Glue
Level 1
Exact amount of glue was used leaving little to no glue ring.
Level 2
Small amount of glue was, left a glue ring that did not exceed the size of a dime.
Level 3
Large amount of glue was used. Glued joint left glue ring the size of a dime to nickel.
Level 4
Excessive amount of glue used. Glued joints left glue ring the size of a nickel or bigger.
Weight
Level 1
Carried >15Lbs of Weight
Level 2
Carried 10-15Lbs of weight
Level 3
Carried 5-10Lbs of weight
Level 4
Carried <5lbs of weight.
Keywords:
bridge, structures, forces, science
Subjects:
Math
Science
Vocational
(General)
Types:
Project
Discuss this rubric
You may also be interested in:
More rubrics by this author
More Math rubrics
More Project rubrics
Do more with this rubric:
Preview
Preview this rubric.
Edit
Modify this rubric.
Copy
Make a copy of this rubric and begin editing the copy.
Print
Show a printable version of this rubric.
Categorize
Add this rubric to multiple categories.
Bookmark
Bookmark this rubric for future reference.
Assess
Test run
Test this rubric or perform an ad-hoc assessment.
Grade
Build a gradebook to assess students.
Collaborate
Apply this rubric to any object and invite others to assess.
Share
Publish
Link, embed, and showcase your rubrics on your website.
Email
Email this rubric to a friend.
Discuss
Discuss this rubric with other members.
Do more with rubrics than ever imagined possible.
Only with iRubric
tm
.
Copyright © 2024
Reazon Systems, Inc.
All rights reserved.
n202
Your browser does not support iframes.
Your browser does not support iframes.
Your browser does not support iframes.