Skip to main content
iRubric: Manufacturing Project - Mailbox rubric

iRubric: Manufacturing Project - Mailbox rubric

find rubric

edit   print   share   Copy to my rubrics   Bookmark   test run   assess...   delete   Do more...
Manufacturing Project - Mailbox 
Manufacturing projects integrating the use of tools, materials and processes dealing with woods, metals, plastics, and ceramics.
Rubric Code: BXX354
Ready to use
Public Rubric
Subject: Vocational  
Type: Project  
Grade Levels: 6-8

Powered by iRubric Mailbox
  Advanced

5 pts

Proficient

4 pts

Basic

3 pts

Fair

2 pts

Poor

1 pts

Incomplete

0 pts

Layout

Advanced

The layout of the project was accurately done with no imperfections.
Proficient

The layout of the project was accurately done with little imperfection.
Basic

The layout of the project was mostly accurate, showing some imperfections that did not have an impact on the final project.
Fair

The layout of the project was below average, showing imperfections that had a significant impact on the final project.
Poor

The layout of the project was poor.
Incomplete

The layout was not complete.
Hinges

Advanced

The hinges were made as directed, allowing the lid to open and close completely, free of resistance.
Proficient

The hinges were made as directed, allowing the lid to open and close with a moderate degree of freedom and motion.
Basic

The hinges were made as directed, but the lid does not have a free range of motion and/or has noticeable resistance.
Fair

The hinges were made as directed, but function improperly.
Poor

The hinges were not made as directed and do not function properly.
Incomplete

The hinges were not completed.
Hems / Bends

Advanced

The bends were all made at the appropriate angles and curve flawlessly. The hems were the correct size and shape. The hems and bends were made according to the layout.
Proficient

The bends were made mostly according to the layout. The less than two hems are not the correct size and/or shape.
Basic

The bends were sufficient enough to hold the project together. The hems were not the correct size and/or shapes but still work.
Fair

Most of the bends and hems were not satisfactory.
Poor

The bends were unsatisfactory and 1 or more of the hems where not made.
Incomplete

The bends and hems were incomplete.
Assembly

Advanced

The project was assembled correctly and all parts work properly.
Proficient

The project assembly was mostly correct and/or one component does not work properly.
Basic

The project assembly was mostly correct and/or two components do not work properly.
Fair

The project assembly was satisfactory and/or two components do not work properly.
Poor

The project assembly was unsatisfactory.
Incomplete

The project was not completely assembled.
Riveting

Advanced

The rivets were properly installed and hold well.
Proficient

Three of the four rivets were installed correctly and hold well.
Basic

Two of the four rivets were installed correctly and hold well.
Fair

One of the four rivets were intalled correctly and hold well.
Poor

None of the rivets were intalled correctly and do not hold well.
Incomplete

Rivets were never installed on the project.
Hooks

Advanced

Both hooks were bent, rounded, and installed properly
Proficient

The hooks were bent, rounded, and installed properly with only one minor flaws.
Basic

The hooks were bent, rounded, and installed properly with two or more minor flaws or one major flaw.
Fair

The hooks were bent, rounded, and installed properly with two major flaws.
Poor

The hooks were not bent, rounded, and installed properly.
Incomplete

The hooks were not completed.
Painting

Advanced

The project was painted completely with no run marks or noticable mistakes. The paint scheme looks professional.
Proficient

The project was painted completely with no run marks or noticable mistakes.
Basic

The project was painted completely with one or more run marks or noticable mistakes.
Fair

The project was painted completey with one or more run marks and noticable mistakes.
Poor

The paint job was overall poorly done.
Incomplete

The project was not painted.
Drilling

Advanced

The holes were drilled properly and everything matches up well.
Proficient

Three of the four holes were drilled properly and match up well.
Basic

Two of the four holes were drilled properly and match up well.
Fair

One of the four holes were drilled properly and match up well.
Poor

The four holes were drilled improperly and do not match up well.
Incomplete

The holes were not drilled.
Spot Welding

Advanced

The appropriate number of spot welds were made, each in the correct position. The welds were not over or under heated.
Proficient

The appropriate number of spot welds were made, but were not well spaced. One of the welds were over or under heated.
Basic

The appropriate number of spot welds were made, but were not well spaced. Several of the welds were over or under heated.
Fair

The appropriate number of spot welds were not made or positioned correctly. Several of the welds were over or under heated.
Poor

The welds do not hold the project together properly.
Incomplete

The spot welds were not completed.
Lid

Advanced

The lid was cut according to the template and fits well.
Proficient

The lid was cut according to the template and fits with some adjustment needed.
Basic

The lid was cut according to the template with one or two mistakes. The lid fits but needs adjustment.
Fair

The lid was not cut according to the template and has other minor imperfections.
Poor

The lid was not cut according to the template and has imperfections. The lid does not fit properly.
Incomplete

The lid was not completed.
Directions

Advanced

The directions were followed completely. Any problems were solve with little or no help from the instructor.
Proficient

The directions were followed completely. Any problems were solved with help from the instructor.
Basic

The directions were not followed exatly and resulted in some small distortions in the final project.
Fair

The directions were not followed exactly and resulted in one or more major problems with the final project.
Poor

The directions were not followed and the final project was poorly done as a result.
Incomplete

The directions were not completed.



Keywords:
  • Mailbox

Subjects:

Types:





Do more with this rubric:

Preview

Preview this rubric.

Edit

Modify this rubric.

Copy

Make a copy of this rubric and begin editing the copy.


Print

Show a printable version of this rubric.

Categorize

Add this rubric to multiple categories.

Bookmark

Bookmark this rubric for future reference.
Assess

Test run

Test this rubric or perform an ad-hoc assessment.

Grade

Build a gradebook to assess students.

Collaborate

Apply this rubric to any object and invite others to assess.
Share

Publish

Link, embed, and showcase your rubrics on your website.

Email

Email this rubric to a friend.

Discuss

Discuss this rubric with other members.
 

Do more with rubrics than ever imagined possible.

Only with iRubrictm.



Copyright © 2024 Reazon Systems, Inc.  All rights reserved.
n60